
With the end of the competition and the beginning of the second week, the operations were transferred to the CAAD facilities in Schlieren , were the Kuka robot is situated. The team was introduced to the robot operations, had a first look on the material and made the first test pieces, incising an ytong block with a jigsaw attached to the Kuka’s arm. Continue reading
